AQUASOL WELDING EZP-8 Pre-Formed Purge Dam, Diameter 8 Inch, 48PK

Item: AA8DYE
Model: EZP-8
Cross Ref: 18C579
15 In Stock.

Ships within 2 days via

We deliver to your doorstep under DAP terms. Customs clearance is for your account

$1,702.40
10% off
$1,532.16 /pkg. of 48 (ex. VAT)
Add To Cart
Request Quote

Unlock 30-day payment terms

Business customers can apply for Net 30
No fees, No interest, Fast approval.

FREE delivery on orders over $ 150.00

Payment

Specifications

Item Pre-Formed Purge Dam
Coating Adhesive
Compatible Pipe Diameter 8"
Diameter 8"
Distance From Weld 6"
Features Dissolves Rapidly Leaving No Residue, Side Walls Tapered To Fit Different Pipe Schedules, Tape Pre-Installed In Sections For Precise Alignment
Material Water Soluble Paper
Material Properties Water Soluble
Standards Epa Approved

Product Details

Aquasol EZP-8 pre-formed purge dam saves time on weld preparation and creates a barrier to retain noble gases. It is useful in off-shore oil rigs, refineries, fossil fuel plants, breweries, processing plants and nuclear power plants.

Shipping Information

Height (cm) 21.84
Length (cm) 23.62
Width (cm) 24.38
HS Code 4823906700
Country Of Origin US
Weight (kg) 0.81

Features

  • Aquasol EZP-8 pre-formed purge dam dissolves rapidly on the application of an aqueous solution to leave no residue.
  • It has pre-installed tape for precise alignment.
  • This EZ Purge unit has tapered side walls to fit pipes of diameter up to 8 inches.
  • Its flat design distributes gas evenly across the dam body.
  • This purge dam is made of 100% biodegradable Aquasol water soluble paper.
  • It is equipped with ZAP (Zero Air Permeability) technology that maximises gas retention and reduces gas expenditures.

Standards and Approvals

  • CE
  • EPA

Documentation

Frequently Asked Questions

What is the flash point of this purge dam?

450 degrees F.

What are the ideal storage conditions of this unit?

  • Store this EZ Purge unit in a dark, cool and humidity-controlled environment.
  • Ideal storage temperature is 70 degrees F with about 50% humidity.
  • Always store this unit in a dry and water-proof package.

How to install this purge dam?

  • Peel the liner off the outer circumference of the dam to fully expose the adhesive.
  • Align adhesive edges to the inside pipe wall and insert the dam to the desired location.
  • Thoroughly press the adhesive on the circumference of the dam to create an even seal.
  • Lightly dab a moist sponge along the tape portion of the dam to ensure zero air permeability.

Other Also Viewed

Explore Products

Welcome to Your U.S. Store!

Since you're visiting from the United States, for the best experience and tailored product searches, please use our dedicated U.S. website.

Go to ChatMRO.com (US)
Continue to International Site